Concrete production
Duble Supply Plant provides simultaneous loading of two tank trucks , has a 5-6 aggregate class division and push completely automated . Production of concrete trucks forwarded directly to vetpërzierës and reaches maximum capacity of about 220 m3 / h or 110 m3 / H for each point supply environmentally friendly systems to the point of loading pluhurkapjes are willing and filters with high suction power , the situated on the ground with capacity ranging from 6500-8500 thinned m3 . / H. Center facility is complete with an automated system for the direction and supervision of the construction site , with computerized control center , the screen that reads and orchestrated everything from production supervisor , who investigates and corrects data on the composition and weighting of doses necessary technological extensions . Full control of the whole production cycle includes the production and humidity . Each cycle dosage is stored and made available for laboratory test or export the data to load . The plant meets all technical and environmental standards provided by the Albanian legislation , currently before the completion of the European ones .